Service 05
Bath & kitchen fixtures
Faucets, shower valves, toilets, disposals, filters and remodel rough-ins. Set level, sealed, and leak-tested at full pressure before we go.
What the visit includes
Everything on the invoice.
- Supply stops and flex lines replaced as standard, not reused
- Faucets, pull-downs, pot fillers and disposals, with the right trap arm
- Shower and tub valves, including pressure-balanced and thermostatic
- Toilets set on a new wax or waxless seal, caulked, checked for rock
- Under-sink and whole-house filters
- Remodel rough-ins for your tile and cabinet trades, with a pressure test before close-up
How it goes
The visit, minute by minute.
Times are typical, not promises. We text if a job runs long.
Bring the fixtureBefore
Yours or ours. Send a link when you book so we bring matching stops and trim.
Remove and prep0:00 – 0:40
Old fixture out, stops replaced, mounting surface cleaned.
Set and connect0:40 – 1:40
Level, sealed, new lines, trap rebuilt if it is tired.
TestLast 15 min
Full pressure, hot and cold, drain run full, old fixture taken away.
Questions
Asked every week.
Can I buy my own faucet?
Yes. Send the link when you book so we bring the right stops and know the spread. We will say if a particular model is a known problem.
Why replace the stops?
The little valves under the sink are usually older than the faucet. Reusing them is how a two-hour job becomes a Saturday call-back.
Do you do remodel rough-ins?
Yes. We move drains and supplies for new layouts, pressure-test before the wall closes, and come back to set trim after tile.

