Ardenwood · Sewer · 2 days
Ardenwood sewer lateral
The third backup in a year. The camera found roots at every clay joint and a belly near the fence. Sixty feet of lateral replaced by open trench, because of the belly, with a new two-way clean-out at the house and a tie-in to the city main inspected by Fremont.
- Duration
- 2 days on site · 1 day locating and camera before
- Size
- 60 ft of 4 in lateral · 2 clean-outs
- Permit
- City of Fremont sewer lateral permit, open-trench inspection before backfill
See how the work progresses
Before, during, finished.
The first frame is the room as we found it; the last is the photo we texted on the final day.




What went in
Parts and tests.
- Pipe4 in ABS, solvent-welded, bedded in sand
- FallQuarter inch per foot, checked with a laser
- Clean-outsTwo-way at the house, one at the property line
- Tie-inFlexible coupling at the city main
- BackfillCompacted in lifts, lawn relaid
- RecordFinal camera footage kept on file
Before / after
Drag the handle.
Compare the starting point with the finished work.
“Two days, and the lawn looked like nothing happened. The camera footage of the old pipe was horrifying.”
Service: Drains & sewer