Sample Elite website. Like this design?

Kitchen & bath
plumbing

The plumbing inside a remodel: moved drains, island sinks, pot fillers, thermostatic shower valves, body sprays. We work to your contractor's drawing and pass rough-in the first time.

First timerough-in inspection pass
To drawingyour contractor's or ours
Two visitsrough and finish
A finished kitchen with a farmhouse sink, bridge faucet and a brass pot filler over the range.
Warm Springs · kitchen, finish day

What's included

In the scope,
not the small print.

  • Review of the plan with your contractor
  • Drain and vent relocations with proper slope
  • Supply rough-in with hammer arrestors
  • Shower valve set to tile thickness
  • Island sink venting that passes
  • Pot fillers, bar sinks, filtered water lines
  • Fixture setting and connection at finish
  • Final test of every fixture

How it runs

Step by step.

  1. Week 0

    Plan

    We read the drawing and flag anything that won't pass before anyone cuts.

  2. Rough-in

    Day 1–3

    Drains, vents and supply run and tested. Inspector scheduled.

  3. Inspection

    Day 4

    Rough passes. Walls can close.

  4. Finish

    After tile

    Fixtures set, valves trimmed, every connection tested.

  5. Walk

    Last hour

    You run every tap with us before we leave.

Questions

Straight answers.

Can the shower move to another wall?

Usually. The drain path and vent decide it; we check both on the first visit.

Do you supply fixtures?

We can, or we install yours. We'll tell you if a chosen fixture needs a different rough-in.

Island sink?

Yes. It needs a proper loop vent or an air-admittance valve where allowed; we draw it for the inspector.

Tell us what the water's doing.
We'll say when we can be there.

Book a visit
Book a visit
Call (408) 555-0163 Book a visit

Claim this website for $0.

We build it free. Plans from $99/month after launch, cancel anytime.