Sample Premium website. Like this design?
Northwind Air
(408) 555-017824/7

Bowers · Furnace

A 1994 furnace out, a two-stage unit in

The combustion test showed 140 ppm CO in the flue and a hairline crack in the exchanger. The customer had a week of space-heater evenings; we had the new unit in on a Tuesday.

1 dayOn site
80k BTUInput
96%AFUE
2 weeksPermit to final
A new gray two-stage furnace standing in a garage closet beside a water heater, black flue and white condensate line neatly run.
Bowers · finished

Eight frames, one camera

The job, frame by frame.

Garage closet in a Bowers tract home, camera on the washer for every frame.

  1. A 1994 furnace out, a two-stage unit in: stage 1, before.01 · Before
  2. A 1994 furnace out, a two-stage unit in: stage 2, assess.02 · Assess
  3. A 1994 furnace out, a two-stage unit in: stage 3, remove.03 · Remove
  4. A 1994 furnace out, a two-stage unit in: stage 4, prepare.04 · Prepare
  5. A 1994 furnace out, a two-stage unit in: stage 5, install.05 · Install
  6. A 1994 furnace out, a two-stage unit in: stage 6, connect.06 · Connect
  7. A 1994 furnace out, a two-stage unit in: stage 7, commission.07 · Commission
  8. A 1994 furnace out, a two-stage unit in: stage 8, finished.08 · Finished

What went in

Equipment and readings.

  • Two-stage 96% furnace, 80,000 BTU input, variable-speed blower
  • PVC intake and exhaust through the garage wall; old B-vent capped
  • Condensate trap, neutraliser and overflow switch
  • 4-inch media filter cabinet, MERV 13
  • Combustion at commissioning: 9 ppm CO, 8.1% O2

“They showed us the CO number on the old one before touching anything. That was the whole decision.”

The OkaforsBowers · sample review

A job like this one? Plan the system.

(408) 555-0178 Plan my system

Claim this website for $0.

We build it free. Plans from $59/month after launch, cancel anytime.

Sent to hello@obraup.com. No payment is taken.