ADUs

An ADU is a small house with the same inspections as a big one. We build to the state rules that let it through planning, and to the standard that lets you rent it or house a parent in it.

16 – 24 weekson site, typical
400 – 1,000 sq fttypical size
A finished single-storey backyard building with sliding doors opening onto a patio.
Backyard unit · concept imagery

What is included

In the contract,
not in the small print.

  • Feasibility check against state ADU rules and your lot
  • Design to planning-exempt size and height where possible
  • Separate address, meter and mailbox arranged
  • Foundation, framing and roof by our own crew
  • Full kitchen and bath, laundry hook-ups
  • Fire separation and sprinklers where required
  • Utility trenching and tie-ins
  • Final inspection and certificate of occupancy

Process

How it runs,
week by week.

Each step has a sign-off. You see the next one before it starts.

  1. Lot checkWeek 0

    Setbacks, height, access and where the utilities are. What size will go through without a hearing.

  2. DesignWeeks 1 – 5

    Drawings to permit level, selections, line-item contract.

  3. PermitWeeks 5 – 11

    The city has sixty days to respond on an ADU. We submit complete so it is one round.

  4. Site and foundationWeeks 11 – 14

    Trenching for utilities, footings, slab.

  5. Framing to close-upWeeks 14 – 22

    Walls, roof, wrap, windows, trades.

  6. Finishes and occupancyWeeks 22 – 30

    Kitchen, bath, floors, paint. Final inspection and the occupancy certificate in your hand.

16 – 24 weekson site, typical
400 – 1,000 sq fttypical size
1 crewstart to keys
2 yrworkmanship warranty, written

FAQ

Straight
answers.

Do I need a planning hearing?

Usually not. A detached ADU under 800 sq ft and 16 ft tall, with 4 ft side and rear setbacks, is approved without one under state law.

Can I convert my garage?

Yes, and it is often the fastest route. The slab, roof and walls are already there; we insulate, add plumbing and bring it to code.

Can I rent it out?

Yes, on leases of thirty days or longer. Short-term rental is restricted in San Jose.

Get a site visit.
Written scope in three days.

(408) 555-0142 Site visit

Claim this website for $0.

We build it free. Plans from $59/month after launch, cancel anytime.

Sent to hello@obraup.com. No payment is taken.