Hall bath rebuilt in place: tub and sliding doors out, a curbless shower with a linear drain in, floating vanity, and the window kept and re-trimmed.
5 weekson site
58 sq ftfloor area
Before & after
Same room,
before and after.
Drag the handle, or use the arrow keys.
The job
Scope, weeks,
materials.
- Duration
- 5 weeks on site · 3 weeks of selections before that
- Size
- 58 sq ft · same footprint
- Permit
- City of San Jose, over the counter
- Neighborhood
- Rose Garden, San Jose
- Crew
- Halden crew of four, one foreman
- Warranty
- Two-year workmanship, in writing
Materials
- ShowerCurbless, linear drain, hot-mop pan, glass panel
- TileLarge-format porcelain, pebble floor in the shower
- VanityFloating white-oak vanity, undermount sink
- FixturesBrushed nickel, thermostatic valve
- VentilationHumidity-sensing fan, ducted to the roof
- LightingSconces at eye level, recessed can in the shower