Sample Elite website. Like this design?
A gray SUV charging from a wall-mounted Level 2 charger in a clean garage.

Case · Lakewood · 2025 · 1 week

Two cars, one 60 A circuit, no panel upgrade.

Lakewood, Sunnyvale. 1 week on site.

Power off
None
Circuit
One 60 A, shared
Charge
Both cars by morning

The case

What the house needed.

Two EVs, a 125 A panel with four spare spaces, and no appetite for a service change. The owners had been quoted a panel upgrade twice. We ran the load calculation and found room for one 60 A circuit, not two.

What we did

  • One 60 A breaker, 6 AWG copper in EMT along the garage wall to two power-sharing chargers.
  • The chargers split 48 A between them: one car charging gets all of it, two cars get 24 A each. Both are full by six.
  • Mounted at the right height for each car's charge port, cables reach without crossing the floor.
  • Permit, inspection, utility EV rate enrolment done in the same week.

Why not a panel upgrade

Because the calculation did not need one. We will tell you when it does, and we will tell you when it does not.

Next: a site walk.

Forty minutes at your panel. We leave you a written scope, the permit path and a start date. Prices come after the walk, never before.

Book a site walk

Or call (408) 555-0147 to confirm availability. Visits are by arrangement.

Book a site walk
Call (408) 555-0147 Book a site walk

Claim this website for $0.

We build it free. Plans from $99/month after launch, cancel anytime.